Doncasters, Blaenavon, Pontypool, phase one suspended ceiling, floors, electrics and lighting.
Doncasters offices in Blaenavon required new suspended ceiling and flooring, along with new oak core doors. Phase one. Office 1,2 and 3 required 18sq metres of 24mm grid and Armstrong fine fissured square edging tile 600 x 600. 18sq metres of altro flooring. Lighting and electrics consisted of 600×600 lay in grid NVC luminaries with CAT 2 diffusors […]