December saw a busy month for MSM Partitioning, with paragon freight management Ltd, in Newport, requiring a new office area, with office partitioning. (A private working area to be integrated with in the already large office area)
The Internal Office requirements were
To supply and install 7 linear metres of Tenon Fire and Sound Partitioning. At the height of 3280 mm.
- Coloured finish to metal frame – work and trims. Various sized full height solid modules, full height solid double – glazed solid modules, integral – blinds and controllers, All modules to be in filled with – 50mm isover insulation, veneered door modules with 150 x 1500 vision – panels, Door furniture: 3 lever lock pack and handles, 100mm grey aluminium skirting, Muraspec Decoration to match existing. Reposition lights and supply new light feed for office.
Our clients were very pleased with their new office, completed on time and within budget.
pictures to follow shortly